The second Ho Chi Minh City environmental sanitation project
The second Ho Chi Minh City environmental sanitation project
Address: Ho Chi Minh city Investor: The investment management authority for HCM environmental sanitation project. Package: Provide Halfen Lifting system
Duc Son Construction Material Co., Ltd has completed the contract, supply Halfen transport anchor for Ho Chi Minh City environmental sanitation project, The environmental sanitation project in phase 2 aims to complete the waste water collection and treatment system for the whole Nhieu Loc - Thi Nghe canal and district 2, and treat waste water of standard class A before discharging. out of the environment Bidding package XL-01 "Exit sewerage" is the first item. This is a technical infrastructure of level 1, construction of drainage diameter D3200 diameter of 7,663 m; To build 21 wells, 9m in diameter and 19 sewage collection hubs along the sides of the sewer lines; To build a sewage drainage pipeline connecting wastewater collection wells into wells of 600-1,000 mm in diameter; total length of 409.5 m. The package is being constructed by an Italian-Thai Development Public Company Limited (ITD) contractor, with construction capital of approximately US $ 85 million and completion time of 36 months. The use of Halfen's transport anchor system contributes significantly to the safety of the lifting and transportation of pre-loaded concrete sluices. Help save time when installing quickly and efficiently.